Dak Lak Wind Power Project
200 MW onshore wind · Dak Lak Province, Vietnam · AIIB-financed
2021 – 2024
Topics: onshore wind · lender E&S requirements · biodiversity · resettlement · Indigenous Peoples
My contributions: environmental fieldwork, baseline study, impact assessment, noise · shadow flicker · visual modelling
Skills used: WindPro, R, QGIS, AIIB Environmental and Social Framework
Official project page: AIIB – Viet Nam: Dak Lak Wind Power Project (No. 000509)
Project at a glance
| Capacity | 200 MW, four 50 MW wind farms |
| Phase 1 | Krong Buk 1, Krong Buk 2, Cu Ne 1 |
| Phase 2 | Cu Ne 2 |
| Location | Dak Lak Province, Central Highlands, Vietnam |
| Sponsor | China Huadian Engineering Company Limited |
| Lender | Asian Infrastructure Investment Bank (AIIB) |
| Financing | USD 100 million, non-sovereign long-term debt |
| Offtake | Long-term power purchase agreements with EVN |
| E&S category | Category A (highest risk level) |
Overview
The project develops four 50 MW wind farms in Dak Lak Province, built in two phases, and sells power to Vietnam Electricity (EVN) under long-term power purchase agreements. AIIB proposed USD 100 million in long-term financing for construction.
Closing the gap to lender standards
The original ESIA was prepared under Vietnamese law and did not fully meet AIIB requirements. To close the gap, a Corrective Environmental and Social Action Plan (CESAP) set out ten areas of work, including:
- an updated Stakeholder Engagement Plan
- a Land Acquisition Audit
- a Resettlement, Livelihood Restoration and Community Development Plan
- a Biodiversity Management Plan and a Birds Adaptive Management Plan
- project-level grievance mechanisms for communities and workers, with third-party review
My role
- Authored Chapter 1 – Introduction of the ESIA covering the project background, applicable standards (AIIB ESF, IFC PS), land acquisition and the scope of the assessment
- Supervised environmental fieldwork covering water, soil, air and noise
- Authored the Environmental Baseline chapter, describing the site’s climatic, hydrological and topographical conditions
- Authored ESIA/ESMP impact chapters on surface water, groundwater, air, noise and soil
- Modelled and assessed noise, shadow flicker and visual impacts of the wind turbines using WindPro, R and QGIS
Project documents (AIIB)
Official documents disclosed by the Asian Infrastructure Investment Bank:
Project summary
Environmental and Social Impact Assessment (ESIA)
- ESIA – Executive Summary
- ESIA – Volume I
- ESIA – Volume II
- ESIA – Volume III
- ESIA – Summary (Vietnamese)
Social management plans
- Stakeholder Engagement Plan
- Indigenous People Plan
- Resettlement and Livelihood Restoration Framework
Corrective Environmental and Social Action Plans (CESAP)
More documents, including Vietnamese versions, are on the AIIB project page.